DRIVEWAYS

Do I need permission for a new driveway?

By DD Tree Care & Landscaping · Published 20 August 2025 · Updated 18 November 2025

Check with your local council

Whether you need permission for a new driveway depends on the work and where it is. For a dropped kerb or a front garden driveway, check with your local council first, as rules can vary. This guide is general and cautious; for a definite answer, contact your council.

Dropped kerbs

If you want to drive over a pavement to reach your driveway, you usually need a dropped kerb, and that normally needs council permission. The council may have rules about who can do the work and how. Check before you start.

Front garden driveways

Turning a front garden into a driveway can need permission, especially if the surface is not porous and the water runs onto the road. Using a porous surface like resin bound, or directing water to a garden area, can help meet the rules. Check with your council to be sure.

Surface water and drainage

Rules around surface water aim to stop water running off driveways onto roads. A porous surface or proper drainage can help. We plan drainage into every driveway so water sheds away from the house and off the surface.

Boundaries and shared access

If the driveway is on a boundary or shared access, check with neighbours and any relevant agreements before work starts. A quick conversation can avoid problems later.

We can help you check

We keep this general and advise you to confirm with the relevant authority before any work. For a free, no-obligation quote on a new driveway, see our new driveways in Newport page.

Need help with a tree, driveway or garden project? We cover Newport, Cardiff, Caerphilly, Pontypridd and Merthyr Tydfil with free, no-obligation quotes. Get a free quote or call 01633 508 173.

Ready to Start Your Project?

Get a free, no-obligation quote from DD Tree Care & Landscaping. Call us, email us or use the form and we will get back to you.

Insured · 35+ years of combined experience · Free quotes